
The Challenge
Delivering a complete electrical installation within a trading supermarket presented several logistical and safety challenges. All works had to be carried out while the store remained fully operational, with minimal noise, disruption, or impact on customers and staff.
The installation also needed to align with Costa Coffee’s brand and interior design standards, ensuring a high-quality visual finish while meeting all current electrical, fire safety, and emergency lighting regulations.
In addition, multiple systems – lighting, power, access control, and air conditioning needed to be integrated into a cohesive, easy-to-manage solution for store staff.




























